The Project
Synergy Creativ was engaged to provide custom lighting solutions for A-SAFE’s new office and gym spaces. The brief required lighting that not only illuminated the areas effectively but also complemented the modern, collaborative design envisioned by The Harris Partnership (Wakefield office). With Elite Group as the electrical contractor, the project demanded high-quality lighting that aligned with the aesthetic and functional goals of the space.
The Challenge
This project required precision and quick turnaround to meet the tight lead times. With intricate designs, the lighting solutions needed to be manufactured with millimetre accuracy to ensure perfect alignment and seamless integration into the office and gym environments. Each fixture needed to meet exacting specifications to complement the overall aesthetic while delivering superior performance.
The Solution
Synergy Creativ’s in-house UK manufacturing capabilities enabled us to meet the project’s stringent timeline while maintaining millimetre-perfect accuracy in every fixture. We supplied bespoke recessed LED Linear lighting for the stairwell, precision-engineered to fit the space with exact measurements. In the gym, we provided custom chevron LED linear lighting that reflected the unique floor pattern, designed with the same level of accuracy. Our ability to manufacture quickly and precisely ensured all lighting elements met the project’s demanding specifications.